
Pijao 1980
| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
| Pijao | SS28 | Howaldtswerke, Kiel, West Germany | 1.4.1972 | 10.4.1974 | 18.4.1975 | in service (2019) | |
| Tayrona | SS29 | Howaldtswerke, Kiel, West Germany | 1.5.1972 | 16.7.1974 | 16.7.1975 | in service (2019) |
|
Displacement standard, t |
1000 |
|
Displacement full, t |
1185 / 1300 |
|
Length, m |
56.1 |
|
Breadth, m |
6.20 |
|
Draught, m |
5.50 |
|
No of shafts |
1 |
|
Machinery |
4 MTU 12V493 TY60 diesel-generators, 1 Siemens electric motor |
|
Power, h. p. |
2400 / 5000 |
|
Max speed, kts |
11 / 21 |
|
Fuel, t |
diesel oil 100 |
| Endurance, nm(kts) | 8000(8) (snorkel) / 400(4) |
|
Armament |
8 - 533 TT (bow, 14 DM-2A3) |
|
Electronic equipment |
Calypso II radar, CSU2-2 sonar suite, PRS3-4 sonar, DR-2000U ECM suite, M8 Mod.24 CCS |
|
Complement |
31 |
| Diving depth operational, m | 250 |
Project history: German type 209/1200, modified and enhanced type 209/1100 with less cramped spaces for armament, equipment and crew.
Modernizations: 1991, both: - CSU2-2 sonar suite; + CSU3-2 sonar suite
2002, both: - CSU3-2 sonar suite; + PSU83-55 sonar suite
2013, both: - DR-2000U ECM suite, M8 Mod.24 CCS; + UME-100 ECM suite, ISUS-80 CCS
Naval service: No significant events.

Pijao 2008
© Ivan Gogin, 2019